Aidoo, I, Fugar, F, Adinyira, E and Ansah, N B (2023) Assessing the level of resilience in construction safety management systems in the Ghanaian construction industry. Journal of Construction in Developing Countries, 28(2), 217-42.

Aminorlah, A I, Rahim, N A, Mohamed, Z and Mazlan, A N (2023) Critical delay factors in typical physical projects: The case of the ministry of home affairs in Malaysia. Journal of Construction in Developing Countries, 28(2), 57-79.

  • Type: Journal Article
  • Keywords: delay; government projects
  • ISBN/ISSN:
  • URL: https://doi.org/10.21315/jcdc-01-22-0014
  • Abstract:
    In Malaysia, public projects have been consistently reported as dilapidated and delayed, causing the government to bear financial losses. Furthermore, the purposes of the projects have not been fully achieved, thus affecting the public interest. This study examined the critical contributing factors to the delay in implementing physical projects in the Ministry of Home Affairs (MOHA). The scope involved the physical construction projects of the Immigration Department of Malaysia’s offices and premises in Malaysia, which was mandated in the 11th Malaysia Plan. A total of 105 respondents, including contractors, consultants, endusers and clients, participated in a survey on the factors and effects of physical project delay. The data were analysed using the relative importance index (RII) and Spearman’s correlation to identify the most critical delay factors and their association with delay effects. A total of 38 delay factors were identified, with contractor-related factors being the most critical, followed by consultant-related, client-related and other factors. These delay factors were found to be positively correlated with the effects of delay, including time and cost overrun, quality, litigation and arbitration, and abandonment.

Amoah, A, Berbegal-Mirabent, J and Marimon, F (2023) National cultural dimensions and their impact on construction project management in developing countries: The case of Ghana. Journal of Construction in Developing Countries, 28(2), 163-87.

Asiedu, E M and Mkansi, M (2023) Critical factors contributing to budget overruns in ghana’s telecommunication industry construction projects. Journal of Construction in Developing Countries, 28(2), 265-93.

Awodele, I A, Mewomo, M C and Eze, E C (2023) Inhibitors to the adoption of building information modelling in modular construction: A case study of the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), 19-36.

Dosumu, O S, Mahame, C, Niyitegeka, S and Hahiirwuwambaza, J A (2023) Applications and challenges of adopting the internet of things (IoT) in the Rwandan construction industry. Journal of Construction in Developing Countries, 28(2), 81-100.

Jibrin, I M and Aminu, S M (2023) Information technology as catalyst for value re-engineering implementation in the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), 189-216.

Moyo, T and Chigara, B (2023) Factors affecting the competence of quantity surveying professionals in Zimbabwe. Journal of Construction in Developing Countries, 28(2), 1-17.

Ojo, A E, Ammasoma, D and Adelakun, J O (2023) Responsiveness of the construction sector to fiscal policy in Nigeria. Journal of Construction in Developing Countries, 28(2), 121-37.

Okoro, C, Nnaji, C, Chileshe, N and Tembo, J (2023) Perceptions of public-private partnerships transportation project success factors in developing countries: An explanatory sequential investigation. Journal of Construction in Developing Countries, 28(2), 295-327.

Omar, M R, Ayob, A, Zakaria, M H, Rahim, N S A, Mokhtar, H, Rani, H A and Rahman, F A (2023) Perspective of construction building professionals on low-carbon materials in Malaysia. Journal of Construction in Developing Countries, 28(2), 139-62.

Saqib, G, Hassan, M U and Zubair, M U (2023) Barriers to incident reporting in the pakistani construction industry: An exploratory factor analysis approach. Journal of Construction in Developing Countries, 28(2), 243-64.

Sierra, F and Rodboonpha, C (2023) Building information modelling implementation models in Thailand: Drivers, benefits, barriers and lessons learned. Journal of Construction in Developing Countries, 28(2), 37-55.

Tehami, M and Seddiki, M (2023) Investigation toward the adoption of building information modelling in Algeria from architects’ perspective. Journal of Construction in Developing Countries, 28(2), 329-52.

Wibowo, A and Hartiati, D (2023) Value-for-money drivers in public-private partnerships in affordable housing in Indonesia: An analytic network process perspective. Journal of Construction in Developing Countries, 28(2), 101-19.